In Nikolayevshchina violation identifications in mining branch – both on the production of a subsoil, and on labor protection

Online: {{ reading || 0 }}Read:{{ views || 880 }}Comments:{{ comments || 0 }}    Rating:(528)         

1250 violations on labor protection are revealed at the mining enterprises of the Nikolaev area by Mining Nikolaev area inspectors of territorial administration of the Gosgorpromnadzor. 156 inspections of a condition of labor protection, industrial safety and protection of a subsoil are carried out. 1250 violations standardly - legal acts are revealed. 79 workers are brought to administrative responsibility, 26 of them - the first heads, reports "to Crime. There is no press" - Gosgorpromnadzor service.

In particular, by inspectors it is established that projects of development of fields on Kazankovsky, Arbuzinsky and Voznesensky's some sandy and granite pits of areas don't adhere.

Mining without existence of the approved projects of development and mountain branches at three enterprises of Arbuzinsky, May Day and Krivoozersky areas is allowed.

Besides, 3 cases of spontaneous development of minerals are revealed by the enterprises which didn't get special permissions to using a subsoil.

- For effective and rational conducting mining operations and use of explosive materials in the area territory it isn't enough efforts of territorial administration, - the chief of territorial administration of the Gosgorpromnadzor on the Nikolaev area Nikolay Eropunov noted. - In our opinion, it is necessary to introduce a number of the actions directed on improvement of a security status at carrying out a mining and demolition work in area with the participation of local authorities and self-government, bodies of prosecutor's office, management of ecology and natural resources and their structural divisions on places, subsections of the Ministry of Emergency Situations of Ukraine.

Reference:

In the first half of the year 2009 in the territory of the Nikolaev area 127 fields of firm minerals and 7 fields of underground waters, including 22 fields of nation-wide appointment are reconnoitered.61 fields are provided in using. Processing of deposits of mineral raw materials on rubble, a brick, cement and bauxites at 19 plants and дробарко - sorting shops is carried out.

-


Комментариев: {{total}}


englishincidents