In Nikolayevshchina on ice 45 people were traumatized, in points of heating there are 123 persons

Online: {{ reading || 0 }}Read:{{ views || 1004 }}Comments:{{ comments || 2 }}    Rating:(607)         

According to "Nikolayevoblenergo" owing to complication of weather conditions power supply of 1 feeder, 4 TP, 1 settlement (page of Andreevo - Zoryano of the Berezansky area) is disconnected. Works on restoration of power supply will be continued on December 18.

Owing to a heavy snowfall on the highway M-14 from Shevchenkovo's village to border with the Kherson area and from border of the Nikolaev area - 20 km in the direction of the city of Kherson in places were formed snow jams to which 14 cargo and 44 cars got, to the place of an event the bulldozer BKT - PK2 abnormally - saving group of the main regional department of the Ministry of Emergency Measures left. By means of a dump works on elimination of snow traps and withdrawal from them 14 cargo and 44 cars were carried out. Clearing of roads with a total length of 70 km is carried out.

According to the Nikolaev oblavtodor for work on clearing of roads 77 pieces of equipment are involved: 48 peskorasbrosochnykh of cars, 5 bulldozers and graders, 24 units of other equipment. In a mode of watch there are 27 pieces of equipment and 37 workers.

Around the city to Nikolaev Avtodor carries out clearing of streets by forces of 10 crews (15 units of equipment, 40 people).

In area 4 centers and 23 points of heating for socially - unprotected segments of the population in which on the present there are 123 persons work.

In fracture clinics of the city of Nikolaev with the injuries got owing to falling addressed the 45th person. In all areas operational staff for collecting, processing, granting operational information and coordination of actions of involved forces and means is created.


Комментариев: {{total}}