CREWE opened "shadow" schemes of the state ecological inspection in the Nikolaev area

Online: {{ reading || 0 }}Read:{{ views || 853 }}Comments:{{ comments || 1 }}    Rating:(514)         

Control - auditing management in the Nikolaev area carried out audit of regional state ecological inspection (for 2007-2008) who established rough violations of the budgetary legislation and the legislation regulating activity of executive authorities.

It became clear that for formation own it is material - technical base primary trade-union organization through which financial and material resources were mobilized was attracted with inspection and further went for repair of rooms and is material - an inspection hardware, reports a press - service CREWE in the Nikolaev area.

Audit established that the chief of inspection in May, 2007 appealed to the head of labor union to provide the free financial aid for repair of an administration premise. The head of labor union in turn dispatched letters to legal entities and subjects of business activity with a request to provide the charitable or sponsor's help for strengthening is material - technical base and repair of the room of ecological inspection.

After that in treasury of labor union the money which small part was spent for acquisition of construction and economic materials and where other money still left "poured down" militiamen should find out.

In particular, the labor union transferred 30 thousand UAH of state of emergency of "ShEV" allegedly for metalplastic windows which actually were made and established on a charitable basis of JSC Ekvator Plant. In addition audit revealed a lack of the construction materials acquired in JSC Spetspromizolyation for the sum over 28 thousand UAH

Also the labor union concluded agreements with contractors about performance of repair work of premises of inspectorate, reconstruction of system of their water supply and a drainage system, heating and gas supply system, and also installation of the furnace. For performance of these works from treasury of labor union it was planned to pay more than 1 million UAH. The carried-out audit established that the cost of repair work was overestimated by 63,2 thousand UAH.

In addition, by audit it is established that inspection "didn't strain" concerning an economical and rational expenditure of budgetary funds.

By results of this audit of 3 officials are brought to administrative responsibility, and for violation of the budgetary legislation to ecological inspection financial sanctions in the form of a stop of operations with budgetary funds are applied.

All materials of audit are transferred to USBU in the Nikolaev area.


Комментариев: {{total}}