The Nikolaev seaport plans to reconstruct old and to construct new tracks

Online: {{ reading || 0 }}Read:{{ views || 973 }}Comments:{{ comments || 0 }}    Rating:(583)         

Goods turnover increase in GP "Nikolaev Sea Trade Port" resulted in need to increase throughput and processing ability of railway economy at the enterprise. About it report in a press - service of the Ministry of transport and communication of Ukraine.

The management of port planned to carry out reconstruction existing and construction of new tracks.

In particular, it is planned: restoration deadlock Kolya No. 35, No. 36 300 meters long everyone; reconstruction of tensometric scales (track No. 8) with lengthening of a weight platform; railroad switch No. 65 and No. 55 restoration with the conclusion of an exhaust track 300 meters long; acquisition of three shunting locomotives.

For conducting of the specified reconstruction of GP "NMTP" signed the contract with GP "Odessa Proyektno — Prospecting Institute of Railway Transport of Ukraine".


Комментариев: {{total}}