In the Snigirevsky area brought into operation the gas pipeline for which construction 200 thousand budgetary hryvnias

Online: {{ reading || 0 }}Read:{{ views || 1073 }}Comments:{{ comments || 0 }}    Rating:(643)         

On October 1 the ceremonial opening of the gas pipeline in the village the Red beam of the Snigirevsky area took place. About it it is reported on a site of the Nikolaev regional state administration.

"To cut a ribbon" there arrived the head of the Snigirevsky district state administration V. Homko and the head of regional council V. Kozyrev. Was going to look at such significant event at 150 inhabitants of this village.

Reference: gas is connected to 5 houses, 45 yards prepare for connection, 41 locals expressed desire to be connected to the gas pipeline. For gas pipeline construction from the regional budget it was spent the 200th yew. UAH

-


Комментариев: {{total}}


englishmoney