On Bukovina ruined the bridge which built after a flood of 2008

Online: {{ reading || 0 }}Read:{{ views || 7353 }}Comments:{{ comments || 0 }}    Rating:(4411)         

Novy Bridge in Roztoki's mudflow of the Putilsky region of Chernovitsky area which constructed after a July flood, fell off on March 30 late evening.

About 30 meters of the bridge fell to the river Cheremosh. About an event journalists learned from comments on local sites of inhabitants of Putilshchini which are again compelled to use a bypass road through next Ivano - Frankovsky area. Only on March 31 in the evening the Service of highways of Chernovitsky area reported about state of emergency.

Novy Bridge through Cheremosh in Roztoki's village was built by JSC Transmost. Its loading capacity is 30 tons. The bridge caved in when on it "Transmost's" representatives tried to stretch boring installation weighing up to 100 tons. On transportation by the bridge of so heavy equipment "Transmost's" representatives had no coordination. Under weight that exceeds admissible norms three times, the bridge gave.

Now employees of JSC Transmost sort the damaged structure. Responsible for incident on own account will repair the damaged bridge.

Of Service of highways of area assure that for two days the bridge will be restored without change of technical characteristics.

-


Комментариев: {{total}}


englishpublic