In August It is southern - the Ukrainian nuclear power plant made 1 billion 360 million 335 thousand kilowatts - hours of the electric power

Online: {{ reading || 0 }}Read:{{ views || 856 }}Comments:{{ comments || 0 }}    Rating:(513)         

In August in the separated subsection "It Is Southern — the Ukrainian Nuclear Power Plant" it is made 1 billion 360 million 335 thousand kilowatts - hours of the electric power, including on:

· The nuclear power plant - 1 billion 345 million 828 thousand kilowatts - hours;

· Tashlyksky pumped storage power plant - 14 million 211 thousand kilowatts - hours;

· Aleksandrovsky hydroelectric power station - 296 thousand kilowatts - hours.

As reports Ministry of Fuel and Energy of Ukraine, for receiving such quantity of the electric power on a thermal power plant it would be necessary to burn 505 thousand tons of Donetsk coal, or 384 million 443 thousand cubic meter of natural gas.

The Rated Capacity Efficiency (RCE) in a month made 60,3%, since the beginning of year - 62,3%. The monthly plan for development of the electric power is implemented for 102,7%, since the beginning of year - 101,1%. Since the beginning of year in the separated subsection "It Is Southern — the Ukrainian Nuclear Power Plant" 11 billion 102 million 767 thousand, and since the operation beginning (December 1982) 413 billion 618 million 200 thousand kilowatts - hours of the electric power were made.

The first power unit was in a cold reserve. The equipment of the second and third power units YuU nuclear power plants worked in the set mode. On August 8 from - for operations of antiemergency automatic equipment the power of the second power unit was reduced by a wrong signal to 500 MWt. On August 9 after elimination of shortcomings the power of the power unit was restored to the nominal.

On Aleksandrovsky hydroelectric power station in work there were first and second hydrounits depending on a consumption of water in the river the Southern Bug. On the second hydrounit planned repair was carried out from August 10 to August 29. Since the beginning of year on AGES it was made 25 million 800 thousand, and since the operation beginning (April, 1999) of 246 million 298 thousand kilowatts - hours of the electric power.

The first and second hydrounits of Tashlyksky pumped storage power plant worked according to the set schedule of loadings. Since the beginning of year on TGAES it was made 137 million 134 thousand, and since the operation beginning (October, 2006) of 538 million 955 thousand kilowatts - hours of the electric power.

Radiation background on an industrial platform It is southern - the Ukrainian nuclear power plant for the specified period I was at the level of natural background values which were measured before start-up of nuclear power plant, and for August 2 makes 10,7 μR/h. Emissions of radioactive materials in environment didn't exceed the established admissible values.

-